On 5/31/12 9:53 AM, M wrote:
While analysing the log file of the optimization proces (X.D00000001) I've discovered, that the number of steps is different than the number from the applied schedule. What is the cause?
See http://salilab.org/modeller/9.10/manual/node258.html, in particular the description of the min_atom_shift parameter.
Ben Webb, Modeller Caretaker -- http://www.salilab.org/modeller/ Modeller mail list: http://salilab.org/mailman/listinfo/modeller_usage